
All articles from the Railway Reports available on this website are licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
Issue No. 205, 2026
Editorial
read
full text (PDF 169 kB)
1. New Bogie for Flat Wagons Designed for High-Speed Container Transportation by Ukrainian Railways
Rostyslav Domin1, Yurii Domin
Pages: 89-96
Summary. The paper is devoted to scientific and technical issues related to the development of a new generation bogie for the equipment of specialized fl at wagons designed for high-speed transportation of containers. Based on the analysis of previous research results and main technical requirements, a technical solution for a bogie with an all-welded frame and axle-box spring suspension, provisionally named TFT, has been proposed. According to the estimated strength of the welded frame of the bogie, satisfactory compliance of the stress-strain state of the frame with regulatory requirements was established. By means of computer modelling, the dynamic performance indicators of the container flat wagon with TFT type bogies were determined in comparison with the case of equipping the flat wagon with three-piece bogies of the model 18-100. The corresponding mathematical models were built according to the calculation schemes of wagons as spatial multibody mechanical systems, taking into account the action of dry friction forces in the spring suspension and in the body supports on the bogies. The results of the study indicate significant advantages in terms of both cargo vibration protection and movement safety of the variant of equipping the f at wagon with TFT bogies. A significantly lower level of force action on the track of the flat wagon with TFT bogies was also noted.
Keywords: flat wagon, TFT type bogie, frame strength evaluation, model 18-100 bogie, calculations of dynamic indicators
full text (PDF 2 368 kB)
2. Railways and Iron Metallurgy – Based on the Example of ArcelorMittal’s Operations in Poland
Marek Graff
Pages: 97-116
Summary. Iron metallurgy is closely linked to railways – the large-scale development of one industry was made possible by the other, and vice versa. The Industrial Revolution, which began in England and Scotland in the 18th century, would not have been possible without steam engines and the discovery of significant hard coal deposits. The development of steam locomotives, which also took place in England at the beginning of the 19th century, made it possible to revolutionise transport – the carriage of passengers and freight. The development of efficient technologies for producing steel in large quantities accelerated the growth of railways, which in turn stimulated industrial development, initially in England and later in France and Germany, altering the face of the European continent. The steel industry in Poland developed in the 19th century, and its growth accelerated after 1945 with the imposition of the communist regime. Currently, steel production has decreased (since 1989), and the majority of ironworks were acquired in 2005 by the Indian conglomerate ArcelorMittal. This meant, among other things, an improvement in production quality – large quantities of crude steel were no longer produced, but rather finished steel products. The modernisation of ironworks in Poland (the technologies applied in the plants established in the 1950s were rather primitive) or, more broadly, the restructuring of the Polish metallurgical industry, meant the closure of the most environmentally burdensome facilities, i.e., an improvement in air quality and the implementation of new production technologies.
Keywords: railways, steel, ironworks, Poland, ArcelorMittal
full text (PDF 11 328 kB)
3. Crisis of the Railway Rolling Stock Industry in Russia
Marek Graff
Pages: 117-130
Summary. This article presents the current state of railway rolling stock production in Russia, focusing primarily on locomotives and multiple units manufactured both by the domestic industry and through cooperation with Western manufacturers from Europe and North America. The introduction of economic sanctions following Russia’s armed aggression against Ukraine has led to significant declines in the number of vehicles produced; for those already in service, these sanctions have resulted in a lack of access to spare parts. Consequently, the state authorities place an emphasis on manufacturing vehicles utilising indigenous technical design, which is therefore outdated (modern vehicles are produced in rather negligible numbers). For this reason, the process of railway modernisation in Russia has slowed down significantly, and the lack of required investment in the sector will lead to its progressive degradation.
Keywords railway in Russia, RZD, NEVZ, Ural Locomotives Works, Kolomna Works
full text (PDF 5 631 kB)
4. Modification of Reverse Curves on Railway Lines Using Connecting Curves
Władysław Koc
Pages: 131-148
Summary: This paper investigates methods for modifying reverse curves, i.e., a geometric layout consisting of two consecutive circular curves (usually with different radii), curving in opposite directions and directly connected to each other. These curves pose certain operational problems due to abrupt changes in curvature. The distance between the intersection points of adjacent main directions of the route, which cannot be too small, was discussed. On modernized railway lines, this requirement is frequently not satisfied, making it necessary to modify reverse curves accordingly. Three geometrical configurations of reverse arcs were considered. In Layout I, the distance between the main points of the route was significant (i.e., 1000 m).
It was demonstrated that in this case, the standard solution involving the use of circular curves with transition curves could be successfully applied. In Layout II, a limited distance between the main points of the route was assumed (i.e., 400 m).
From the perspective of train speeds, the standard solution did not meet the requirements in this case. Therefore, a curve connecting the two extreme main directions was proposed; this curve satisfies the appropriate boundary conditions and the assumed differential equation. By increasing the length of this curve, higher maximum train speeds can be achieved.
One limitation may be the obstacles that arise, for example, due to the terrain conditions. Layout III is characterized by a short distance between the main points of the route (i.e., 200 m). The standard solution also proves unacceptable here for structural reasons, i.e., the incorporation of rolling stock wheels into the track with very small radii of the circular curves.
Using an extended connecting curve may prove to be the only advantageous solution in this situation. The proposed method of modifying reverse curves provides a practical solution to design problems.
Keywords: high-speed railway lines, reverse curves, modification methods, extended connecting curve concept, train speed analysis
full text (PDF 1 904 kB)
5. Pearlitic Interlamellar Spacing as a Tool for Evaluating Hot-Forged R260 Steel Frog Points
Małgorzata Ostromęcka
Pages: 149-157
Summary: This The article presents an analysis of the usefulness of measuring pearlite interlamellar spacing in R260 steel frog points as a tool supporting the assessment of hot forging quality. The study was conducted using a digital light microscope. The work discusses the relationship between pearlite morphology and mechanical properties, highlighting the importance of quantitative microstructural evaluation in the context of technological process control of frog points.
Keywords: R260 steel, pearlite, interlamellar spacing, light microscopy, hardness, hot forging
full text (PDF 3 089 kB)

All articles from the Railway Reports available on this website are licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
Issue No. 200, 2023
Editorial
read
full text (PDF 162 kB)
1. Longitudinal Sectioning of Overhead Contact Lines in Stations on Single-Track Lines
Damian DRATWA
Pages: 139-151
Summary. The length of standard gauge rail lines under the management of PKP Polskie Linie Kolejowe S.A. is 18,522.503 km, including 11,940.509 km of electrifi ed lines. In order to ensure reliable power supply to the electric traction, as well as to ensure that work can be carried out when the voltage on the overhead contact lines is switched off or as a result of a breakdown, sectioning is used. By electrically sectioning the overhead contact line, specifi c sections of it can be switched off. The impact on station capacity as a result of a power outage in the overhead contact line depends on how the sectioning is performed. Th is performance is not strictly defi ned in the case of stations on single-track lines, where the sectioning of the overhead contact line is done in diff erent ways. The article analyses the impact of longitudinal sectioning on the possibility of running trains by electric traction, using the example of two sections of single-track railroad lines No. 15 and No. 16.
Keywords: overhead contact line, longitudinal sectioning, station capacity, track closures, maintenance of overhead contact line
full text (PDF 3 177 kB)
2. Factors Determining the Development of Rail Passenger and Freight Transport on the Example of the Podkarpackie Voivodeship
Marek GRAFF
Pages: 153-170
Summary. The availability of EU funds for the modernization of infrastructure, including railways (infrastructure renovations and rolling stock purchases) has led the local authorities of the Podkarpackie Voivodeship to acquire diesel-powered rolling stock initially and later electric, too. Renovations of the railway network are – on the one hand – carried out by the infrastructure owner Polskie Linie Kolejowe (PLK), which is managed centrally, and – on the other hand – more complicated due to costs as well as legal and procedural issues (the need to comply with EU law). Thus, for example, the modernization of LK 91 Kraków – Rzeszów only began in 2011; for comparison, the first diesel vehicles were purchased by the Marshal’s Office of the Podkarpackie Voivodeship in Rzeszów in 2004, and electric vehicles in 2013. As more vehicles were acquired (by mid-2023 the number – including those ordered – was 49) and the infrastructure was renovated. Th en it was decided to launch a Suburban Agglomeration Railway (PKA), connecting Rzeszów with towns located up to 50 km from the capital of the Podkarpackie Voivodeship via the existing railway infrastructure. A comprehensive modernization of Rzeszów Główny Station is underway now including renovation of the station building. Also, due to the proximity of the border with Ukraine, the modernization of the eastbound railway lines and border stations of PLK and UZ (1435 + 1520 mm) started a few years ago. After the Russian invasion of Ukraine in February 2022, they proved to be much needed given the need to transport refugees and international aid to Ukraine.
Keywords: Podkarpackie Voivodeship, PLK, PKA (Suburban Railway in Podkarpacie), Jasionka Airport
full text (PDF 4 379 kB)
3. Basic Variants of the Analytical Method of Designing Track Geometric Layouts
Władysław KOC
Pages: 171-185
Summary. The article presents (and extends) the basic assumptions of the analytical method for designing track geometric layouts. The individual elements of the layout (straight sections, circular arcs and transition curves) are described using mathematical equations and connected with each other while maintaining the condition of tangent compliance. The method covers various design cases: asymmetrical case, with transition curves of the same type and the same length, an asymmetrical case, resulting from diff erent types and lengths of transition curves, as well as methods of designing compound and reverse curves. The work presents a detailed design procedure for the typical, most common case in which the transition curves are symmetrical in relation to the circular arc. Two basic variants diff ering in the location of the local coordinate system are considered. In the standard (universal) variant, the location of the beginning of the system in the PL-2000 system is not known and is determined only in the final phase of the procedure. Due to this, some interpretation problems may arise. In the case of a symmetrical geometric layout, these diffi culties can be avoided thanks to the introduced modifi cation consisting of locating the origin of the local coordinate system at the intersection of two main directions of the route. The article presents computational algorithms for both discussed variants. The benefits of the introduced modifi cation are illustrated by the presented computational examples.
Keywords railroad, analytical design method, modifi cation of the local coordinate system, calculation algorithm, sample geometric layouts
full text (PDF 1 216 kB)
4. Key Issues Related to Permanent Way in the Work of Professor Henryk Bałuch
Andrzej MASSEL
Pages: 187-191
full text (PDF 233 kB)
5. Overview of the Areas of the Railway Research Institute Activities
Marek PAWLIK
Pages: 193-207
Summary: Railway transport employs mechanical, pneumatic, electrical, electrotechnical, relay, and electronic programmable solutions, as well as hydraulic, optical and laser-based solutions for the construction and everyday exploitation of various infrastructure and rolling stock functionalities and for supporting and documenting both operation and maintenance. The safe and reliable operation of railways depends, to a significant extent, on the proper interaction of the various technical and procedural solutions. It is based on normative documents, approval procedures and rules regarding handling technical, operational and organisational changes. The article presents the railway system’s technical complexity as well as types and formal constraints of the normative and legal documents defining technical and procedural requirements, using both of them as a background for showing the Railway Research Institute’s areas of activities from technical competencies and research facilities used in approval processes to involvement in the development of normative documents.
Keywords: railway infrastructure, railway rolling stock, approval processes, normative documents
full text (PDF 298 kB)
6. Environmental Impacts of High-Speed Rail. Part 1: Acoustic Impacts
Krzysztof POLAK
Pages: 209-216
Summary: The article discusses issues related to acoustic impacts generated by high-speed railways. It indicates the most important legal regulations concerning noise in railway transport and characterises the main sources of noise generated by highspeed railway lines. It attempts to determine the negative acoustic impact on various elements of the environment during the construction, operation and decommissioning of a high-speed railways. Furthermore, it also outlines the most frequently applied solutions to minimise this impact.
Keywords: noise, acoustic impact, high-speed railway, environmental impact of high-speed railway
full text (PDF 554 kB)
7. Electrical Endurance of DC Switching Devices
Artur ROJEK
Pages: 217-227
Summary: The article focuses on the electrical endurance testing of direct current switching devices, such as high speed circuit breakers, switch disconnectors and contactors. It presents the normative requirements for these tests and provides sample results obtained during testing conducted in the electrical laboratory of the Department of Electrical Power Engineering at the Railway Research Institute. The most commonly tested switching devices have nominal voltages of 900, 1800, and 3600 V DC, with nominal currents of up to 6.5 kA. The article also discusses phenomena and hazards that may occur during electrical endurance testing.
Keywords: electrical endurance, high speed circuit breaker, switch disconnector, contactor, DC breaking
full text (PDF 2 605 kB)
8. Change of the Electric Traction Power Supply System in Poland From 3 kV DC to 25 kV AC
Artur ROJEK
Pages: 229-241
Summary: The article compares the 3 kV DC and 25 kV AC railway electric traction power supply systems. Both systems were characterised, including their requirements in terms of power supply to traction substations, system losses and the influence of the choice of system on the parameters of railway traffic.
Keywords: electric traction power supply system, 3 kV DC system, 25 kV AC system, energy losses, catenary
full text (PDF 663 kB)
9. Research Issues Regarding the Impact of a Rolling Stock on a Trackside Train Detection Systems Devices
Łukasz ZAWADKA, Dominik ADAMSKI
Pages: 243-249
Summary: The paper characterises the operation and basic components of track occupancy devices that are currently used on the PKP PLK S.A. network. Furthermore research methods of measurement of railway vehicles impact on track circuits and axle counter systems as well as wheel set axle impedance measurement that are performed in Railway Research Institute were described. Examples of measurement results were presented for each of the described methods.
Keywords: track circuits, axle counters, interference, magnetic fields, EMC
full text (PDF 930 kB)
10. Aerodynamic Phenomena Caused by the Passage of a Train. Part 6: Other Infl uences. Summary of Series
Andrzej Zbieć
Pages: 251-257
Summary: This series of articles describes the aerodynamic phenomena caused by the passage of a train, characterising the effects that a train running at high speed has on itself, other trains, trackside objects and people. This impact can be of two types − generated pressure and slipstream. Apart from the literature analysis, the author’s research is also taken into account. The sixth part of the series describes mixed aerodynamic impacts on people, as well as other types of impacts, and summarises the entire series.
Keywords: rolling stock, high speed railways, aerodynamic phenomena
full text (PDF 683 kB)